We are now living full-time at No12 and in the process of moving everything across from No 10 except that there is not enough room for all the clutter we accumulated over 28 years in York. And not yet enough shelves, so the floor is covered with boxes and frankly it looked better before we moved in. So no photos of the inside until we have it sorted.
The photo-voltaics are generating electricity and the Heat Recovery system recovering heat
However the front is looking great with the drive finished and the patio wall is well underway at the back. Peter is doing the fencing and decking himself and planning to have it done by next weekend's Passivhaus Open Day. Margot will be hosting a number of visitors while Peter is off sea kayaking in Anglesey (well, only if he gets it all done in time).
Passivhaus on Derwent Road
Thursday, 2 November 2017
Monday, 9 October 2017
Moving In
We did a presentation as part of St Nick's Ecohomes weekend with Peter, Phil Bixby, the architect, and Steve Kent, the Builder, giving our different perspectives. We then invited anyone interested - plus the immediate neighbours who had suffered months of disruption - to have a look around before we spoilt it by moving our clutter in. About 20 came by, even without refreshments being on offer. Next month there is the national passivhaus event, Margot and Phil will be 'at home' here but I am off to Anglesey sea kayaking.
So, for now we can show you a photo of the ground floor empty but without the protective floor covering.
Thabks for the flowers Steve !
So now we have full possession of the house - we just have to negotiate our way round the works that continue on the driveway, patio and along both sides. But nearly done, and then the harris fencing can come down and it will look like a real home.
So, for now we can show you a photo of the ground floor empty but without the protective floor covering.
Thabks for the flowers Steve !
So now we have full possession of the house - we just have to negotiate our way round the works that continue on the driveway, patio and along both sides. But nearly done, and then the harris fencing can come down and it will look like a real home.
Sunday, 24 September 2017
Practical Completion
22nd September 2017 and the house is ours!
We decided to accept partial completion so we could get on with moving in and letting number 10. The works to the front drive, including a floodwater attenuation sump, remain to be done as well as the fencing and rear patio decking, which Peter will do himself. He has also been inside on evenings and weekends finishing the flooring to the attic space.
We have power and light inside and hot water, though we still need it to be fine tuned and we need to be given instruction on how to work the Heat Recovery system. The carpet fitters have been in so its a great opportunity to take photos of how clean and spacious it looks before we move all our 'stuff' in. We missed the chance to de-clutter before moving out of number 10 but nothing is allowed to go next door unless it is clearly useful and wanted - which means masses of un-sorted boxes going into storage until we get a chance to go sift through them. Its amazing how much stuff can accumulate unnoticed over 28 years.
We have allowed 3 weeks for final completion during which time we will be busy fitting shelves, curtain rails and fighting over who has more wardrobe space. Then we think about the house-warming party
We decided to accept partial completion so we could get on with moving in and letting number 10. The works to the front drive, including a floodwater attenuation sump, remain to be done as well as the fencing and rear patio decking, which Peter will do himself. He has also been inside on evenings and weekends finishing the flooring to the attic space.
We have power and light inside and hot water, though we still need it to be fine tuned and we need to be given instruction on how to work the Heat Recovery system. The carpet fitters have been in so its a great opportunity to take photos of how clean and spacious it looks before we move all our 'stuff' in. We missed the chance to de-clutter before moving out of number 10 but nothing is allowed to go next door unless it is clearly useful and wanted - which means masses of un-sorted boxes going into storage until we get a chance to go sift through them. Its amazing how much stuff can accumulate unnoticed over 28 years.
We have allowed 3 weeks for final completion during which time we will be busy fitting shelves, curtain rails and fighting over who has more wardrobe space. Then we think about the house-warming party
Thursday, 7 September 2017
Scaffold Down
We think it looks great
Meanwhile, back at No 10 we are frantically boxing up 30 years of accumulated 'stuff' trying to keep one step ahead of Derek and Clive painting the rooms we need to do before we offer it for letting. Tomorrow the man from the Removals is going to tell us how much it will cost to move things 20 yards down the road (just the big stuff - like baby grand pianos for example - we have had offers from friends and family to help with the rest).
And then the drive and patio. And then the house warming party!
Thursday, 31 August 2017
Completion in site
No photos as its all but finished and we have dates for the scaffolding coming down and the final handover. You can then see the finished product. The inside will be ready before the outside so we are negotiating early access to help get around the log-jam of having to get No 10 ready for letting. We have to do some redecoration but need to clear out 30 years of accumulated 'stuff' first but nowhere to put it.
Tomorrow the Heat Recovery guy finishes and will give us a tutorial on how to make it work. The electricity is on with water to follow soon. This weekend once the builders have gone we will be in doing some minor finishing touches to save a bit of money - the flooring in the attic room, the curtain rails and curtains.
Later in September we will be starring in an Eco-homes event at our local Environmental Resource Centre www.stnicks.org.uk hopefully with the architect and builder too and in November there is special Passivhaus open event. Before then we will behaving a house warming party for family and friends but also for all the long-suffering neighbours who have had the road blocked by builders wagons and excavations
Tomorrow the Heat Recovery guy finishes and will give us a tutorial on how to make it work. The electricity is on with water to follow soon. This weekend once the builders have gone we will be in doing some minor finishing touches to save a bit of money - the flooring in the attic room, the curtain rails and curtains.
Later in September we will be starring in an Eco-homes event at our local Environmental Resource Centre www.stnicks.org.uk hopefully with the architect and builder too and in November there is special Passivhaus open event. Before then we will behaving a house warming party for family and friends but also for all the long-suffering neighbours who have had the road blocked by builders wagons and excavations
Wednesday, 16 August 2017
Nearly there?
Lots of progress and we now have our own set of keys so we can sneak in and take a look around when the builders go home. We don't want to get in the way as the finish line is in sight.
Outside the rendering to the sides and rear has been completed as well as the half of the front that will be covered with timber slats. The other half, brick now as the tiles were prohibitively expensive (and quite honestly we like it in brick better), is within inches of the eaves and looking really good. Jason is an ace bricklayer when he is not supervising all the other trades. The interior is coming on too with Peter laying the floor, hanging the cupboards and doors. The electrician has nearly finished and the bathrooms are fitted out and tiled.
We have decided to keep the paintwork off-white throughout as we have so much in the way of wall hangings and pictures we decided to hang them all first and then see if any extra colour was needed. Maybe not as the white and all the timber looks good already.
We blocked the road again as the mains electricity was connected and the meter goes in on Friday. Yesterday I got a letter from British Gas telling me their prices were going up! Since they will be paying us maybe I should warn them that our prices are going up too, though I am not sure it works like that. Our current 'green' supplier cant do Passivhaus installations though we could switch back as soon as we move in. But since they wont be getting any money from us I doubt if they will want us.
Next week the heat recovery system goes in.
Apart from making decisions we have been busy on the garden which we are doing ourselves We have laid the turf and once the scaffold is down we can start on the fencing and patio
Outside the rendering to the sides and rear has been completed as well as the half of the front that will be covered with timber slats. The other half, brick now as the tiles were prohibitively expensive (and quite honestly we like it in brick better), is within inches of the eaves and looking really good. Jason is an ace bricklayer when he is not supervising all the other trades. The interior is coming on too with Peter laying the floor, hanging the cupboards and doors. The electrician has nearly finished and the bathrooms are fitted out and tiled.
We have decided to keep the paintwork off-white throughout as we have so much in the way of wall hangings and pictures we decided to hang them all first and then see if any extra colour was needed. Maybe not as the white and all the timber looks good already.
We blocked the road again as the mains electricity was connected and the meter goes in on Friday. Yesterday I got a letter from British Gas telling me their prices were going up! Since they will be paying us maybe I should warn them that our prices are going up too, though I am not sure it works like that. Our current 'green' supplier cant do Passivhaus installations though we could switch back as soon as we move in. But since they wont be getting any money from us I doubt if they will want us.
Next week the heat recovery system goes in.
Apart from making decisions we have been busy on the garden which we are doing ourselves We have laid the turf and once the scaffold is down we can start on the fencing and patio
Friday, 21 July 2017
Catching Up - again!
Its been a while since I posted anything. It’s not that the
builders have not been beavering away but first fixing is not very photogenic.
Lots of wiring, plumbing and noggins have been going in, never to be seen
again. Because of this we have been summonsed regularly by Peter the Joiner or
Bob the Plumber to make sure everything was going where it should or to agree
a minor change because what was planned didn’t quite work.
Much worse for us we are having to make final decisions
about finishes – colours and textures of tiles, flooring, banisters, doors –
which means going out to Tile Depot or
Howdens and finally making our minds up. We are trying to keep a balance
between simple and modern as the house probably needs and not wanting it to be
too bland. On the other hand we have so much in the way of pictures, bookshelves
and trinkets from foreign parts no one will see the decorations anyway!
Most noticeable of the changes have been the bathrooms and kitchen with the kitchen in particular looking very much like the finished product and thankfully looking just as we wanted it. You can never be quite sure until it is actually there.
We will be finishing off the loft space ourselves though it is intended to act as a study (no longer separate studies! How will that work?) but already, now it is fully plastered out, it looks like a great space.
In fact, all the rooms are looking quite spacious and - prompted by the cost of storage of baby grand pianos - we are re-considering if in fact we can fit it in the living area, at least until our aspiring Liberace has enough space to take it off us.
On Monday the painter comes in, so more decisions this weekend, but it will really begin to look OK. We have also had a quote for the Juliet balconies - more than we expected but, as the old saying goes - 'don't spoil the ship for a happorth of tar' (translation available on Wikipedia for those not from a nautical background)
Subscribe to:
Posts (Atom)